Cat6/Cat6A structured cabling
Network installation begins with an assessment of floor plans, cable routes, work areas, and active devices. The correct cable category is selected for the required speed, link length, and environmental conditions.
Every outlet is terminated at the patch panel, labelled and tested, making the network easier to manage, troubleshoot, and expand.
- Planning Cat6/Cat6A copper cabling and fibre uplinks
- Installing network outlets, patch panels, and racks
- Organising cables and labelling both ends clearly
- Testing every link and preparing handover documentation